Introduction
Imagine a world where your AI assistants, cloud apps, and smartphones become twice as powerful yet far more energy-efficient. This is not a distant dream—it’s the reality TSMC is building in southern Taiwan. The semiconductor giant’s TSMC Kaohsiung 2nm has just completed trial production of its first 12-inch 2-nanometer wafers, a milestone that positions Kaohsiung at the forefront of next-generation chip production.
According to Economic Daily News, this achievement comes ahead of schedule and reflects TSMC’s strategic push into the sub-2nm era, with an initial annual output value estimated at NT$150 billion (≈US$4.7 billion). For anyone tracking AI, high-performance computing (HPC), or the semiconductor race, Kaohsiung is the place to watch.
5-Point Overview
TSMC Kaohsiung F22 completes first 12-inch 2nm wafer trial ahead of schedule.
Five 2nm fabs planned; sixth fab may support A14.
A14 mass production set for 2028 across Taichung/Hsinchu; Kaohsiung may contribute.
Kaohsiung outpaces Arizona, reinforcing Taiwan as a sub-2nm hub.
All five Kaohsiung fabs operational by Q4 2027, supporting AI/HPC demand.
Why TSMC Kaohsiung Is a Game-Changer
Trial Production Ahead of Schedule
Kaohsiung F22 has completed its first 2nm wafer trial production. While 2nm technology might sound like abstract science, in practical terms, it means smaller, faster, and more energy-efficient transistors.
For consumers, it translates into faster AI chips, more capable data centers, and improved battery life in devices.
Expansion Plans That Reflect Demand
TSMC is not stopping at one fab. Kaohsiung’s F22 site will house five fabs (P1–P5) dedicated to the 2nm family.
The A16 process with BSPDN (backside power delivery) will launch in 2026, while a potential sixth fab (P6) may focus on the even smaller A14 (1.4nm) process.
This demonstrates TSMC’s forward-looking approach, ensuring Taiwan remains at the center of the global semiconductor ecosystem.
/techovedas.com/tsmc-taiwan-expansion-15-new-chip-fabs-amid-global-push-and-safety-setbacks/
The A14 Process: The Next Frontier
Mass production of A14 (1.4nm) process is planned for 2028. Key production hubs will include:
- Hsinchu Baoshan Fab 20 (P3–P4): Leading development
- Taichung Fab 25: Four fabs beginning construction end of 2025, production H2 2028
If Kaohsiung’s P6 fab adopts A14, it will provide flexibility and additional capacity to meet the skyrocketing demand for AI and HPC chips.
Kaohsiung vs Arizona: A Race Against Time
While TSMC’s Arizona plant is also slated for 2nm/A16 production in P3–P4, cleanroom construction is expected to begin mid-2026, meaning large-scale production before 2028 is unlikely. Kaohsiung’s head start makes it the primary global hub for sub-2nm production.
This gap emphasizes Taiwan’s strategic advantage in advanced semiconductor manufacturing, which could have long-term implications for AI chip supply chains and high-performance computing markets worldwide.
Timeline & Investment: How Fast Kaohsiung Is Moving
The Kaohsiung campus is TSMC’s largest southern Taiwan investment:
- P1: 2nm mass production end-2025
- P2: Installation ongoing; mass production Q2 2026
- P3: Construction approved Oct 2024
- P4–P5: Approved July 2025
All five fabs (P1–P5) are expected operational by Q4 2027, forming a world-leading 2nm cluster faster than initially projected.
techovedas.com/tsmc-2nm-countdown-begins-with-15-customers-ai-hpc-giants-lead-the-charge/
Why 2nm & A14 Matter for AI and HPC
TSMC’s 2nm and A14 processes are not just numbers—they represent real-world improvements:
- Higher Performance: More transistors per chip, enabling faster AI calculations
- Energy Efficiency: Reduced power consumption for data centers and devices
- AI Workloads: Ideal for training and running large-scale machine learning models
- Cloud Computing: Supports increasingly demanding workloads for enterprise clients
In short, these chips power everything from smartphones to autonomous vehicles to AI supercomputers.
What’s Next for TSMC
- 2025: P1 begins 2nm mass production; P2 installation completes
- 2026: A16 process launches; ongoing fab construction in Kaohsiung
- 2028: Mass production of A14 in Taichung/Hsinchu; Kaohsiung P6 may adopt A14
This phased approach ensures scalable, high-performance chip production while maintaining TSMC’s competitive edge globally.
Conclusion:
TSMC Kaohsiung campus isn’t just keeping pace—it’s leading the global race for sub-2nm chips.
With trial production complete, five fabs on the way, and the A14 process on the horizon, Kaohsiung is set to power the next generation of AI, HPC, and energy-efficient devices.
For Taiwan and the world, this isn’t just semiconductor progress—it’s a quantum leap toward the future of computing.
For more of such news and views choose Techovedas! Your semiconductor Guide and Mate!



